CLOSE AD ×

Measure for Measure

Measure for Measure

On Election Day across the country, citizens registered their votes for major changes in the White House and Congress. But change will also soon come to California’s built environment, as several major initiatives facing California transit, infrastructure, and development were approved or denied. 

On the statewide ballot, Proposition 1A passed with 52.3 percent approval, meaning a high-speed train linking San Diego, Los Angeles, San Francisco, and Sacramento—and most major cities in between—could be ferrying passengers at speeds of up to 220 miles per hour by 2030. While a whopping $9.95 billion in state bonds was allocated by the proposition, development cannot continue until matching funds are secured from federal, local, and private sources. A business plan for the program was released on November 7, equating it in scale to the State Water Project, the world’s largest public water and power system, funded by a 1960 bond measure. California High Speed Rail Authority chairman Quentin Kopp called the proposition’s approval a “21st-century golden spike." 

Once funding is secured, the Authority will focus first on the LA-to-San Francisco “backbone” segment. Environmental impact reports have been completed for the route and alignments chosen, with the exception of the Northern Mountain Crossing connection between San Jose or Oakland and the Central Valley.

In Los Angeles County, another major transit proposal, Measure R, reported 67.93 percent voter approval when a 2/3 majority was needed. The 30-year, half-cent sales tax increase will fund improvements and expansions for light rail and subway lines, HOV lanes, freeways, and traffic reduction. According to Metro spokesman Rick Jager, the tax will go into effect next July, and citizens could start to see evidence immediately, since a portion of the funds will go directly to LA-area city governments. “The local return is an important element because these 88 cities will start getting their 15 percent share from the tax that’s generated,” he said, noting that many cities had plans for street resurfacing, pothole repairs, improving left-hand signals, pedestrian improvements, and bikeways. It also postpones a planned Metro fare increase to 2010.

The rest of the funds generated by Measure R will be available in 2010, when the major projects up for funding will be an extension of the Gold Line that goes to Azusa (the first six-mile extension of the Gold Line, begun in 2004, is on budget and on schedule to open in the summer of 2009), the Green Line extension to LAX, and the second phase of the light rail Expo Line stretching from downtown LA to Santa Monica. The first segment of the Expo Line’s route from downtown to Culver City is scheduled to open in 2010, and with this burst of funding, it could reach Santa Monica as early as 2013. Later, funding will become available for the Purple Line or “Subway to the Sea” extension in 2013.

In Santa Monica, the hotly-contested Proposition T, which would have limited development in the city to under 75,000 square feet annually, was defeated 55.92 percent to 44.08 percent. This was a relief to many architects and developers who had fought hard against the measure, including Gwynne Pugh of Pugh + Scarpa, who, in his role on Santa Monica’s planning commission, will address Proposition T’s concerns in the city’s new Land Use and Circulation Element (LUCE), which is currently in environmental impact reviews. “The LUCE has addressed this issue by stating that there will be a goal of ‘no new net trips,’” he said. “Unlike previous plans, this will be monitored, and development phased as resources are developed such as the Expo Line.”

After Beverly Hills’ city council approved a 12-story, 170-room Waldorf-Astoria hotel and two condo buildings on the site of the Beverly Hilton in May, opposed residents gathered enough signatures to put the decision on the ballot as Measure H. After results were too close to call for several weeks, on December 2 the city certified that Measure H had been approved by 129 votes, meaning that an architectural design review and tract map will move forward as planned.

In San Francisco, Proposition B, which would have required the city to set aside 2.5 cents for every $100 of assessed value over the next 15 years for affordable housing, failed 47.4 percent to 52.6 percent. This was disheartening to housing advocates and the city’s Board of Supervisors, who strongly urged its approval to prevent what they called an “affordable housing crisis” due to budgetary concerns. Proposition B would have allocated $30 million to help house those making less than $18,000. According to housing advocate Calvin Welch, the budget currently only reserves $3 million for affordable housing. Mayor Gavin Newsom was one of the strongest opponents of Prop B, arguing that it was unnecessary.

And while its outcome did not directly impact architects, another Measure R, this one also in San Francisco, was certainly a topic of conversation for anyone working in infrastructure: This ballot initiative that would have renamed a Bay Area sewage plant in honor of President George W. Bush was soundly defeated.

CLOSE AD ×