Posts tagged with "WTC Performing Arts Center":

Placeholder Alt Text

REX’s performing arts center obtains $89 million to speed up construction

Last week, the Ronald O. Perelman Center for the Performing Arts, which is currently under construction at the World Trade Center site, was awarded an $89 million grant by the Lower Manhattan Development Corporation (LMDC) and the U.S. Department of Housing and Urban Development (HUD). The long-awaited funding brought the project 82 percent of the way toward meeting its total construction costs. “We are grateful to the LMDC for their support to help realize the dream of creating a performing arts center in Lower Manhattan that will serve the local community, New Yorkers from all five boroughs, New Jersey residents, and visitors from around the nation and the world," said Maggie Boepple, President of the Perelman Center. Designed by New York–based firm REX Architecture, the 90,000-square-foot, 138-foot-tall cube-like structure will hold three open and flexible performance spaces that can fit up to 1,200 people. Its bold exterior, which is clad in marble on all four sides, will stand out from the sea of skyscrapers that surround it. The site will also hold various public meeting spaces and an open plaza. At night, the exterior facade will be illuminated with a warm glow. Since construction commenced in June 2017, the main building’s steel skeleton has risen at a relatively monotonous pace, as the majority of construction has taken place below street level at the soon-to-be Vehicle Security Center. Its main entrance is situated beneath the Financial District’s Liberty Park. As of now, an intricate web of concrete pours and steel beams supports the underground garage floors that compose the lower section of the site. Now that funding has been received, the Performing Arts Center should top out by the end of next year and is scheduled to be fully completed in 2021.
Placeholder Alt Text

Future of Gehry’s World Trade Center Performing Arts Center Still Uncertain

It is not uncommon for projects to change over time, but the performing arts center planned for the World Trade Center site has undergone many iterations. It has been tweaked, downsized, refocused, delayed, and at one point, possibly re-located to another site. Now, the New York Times reported that the center has been whittled down from a four-stage arts complex housing multiple cultural organizations—including the International Freedom Center, Signature Theater, the Drawing Center, and the Joyce Theater—to a multidisciplinary arts space with just one main stage. The Joyce Theater is the only remaining organization that will still be part of the center, though it will not be based at the World Trade Center site as previously planned. The next step is to find an artistic director who can oversee center and curate its programming. Frank Gehry has been working on the design of the center, but the recent changes have called for him to scale it back. Once costs and programming are nailed down, the preliminary board will move forward with fundraising efforts. Right now, though, it looks like the center won’t open its doors until 2017 or 2018.