Posts tagged with "Matt Construction":

Placeholder Alt Text

Paul Matt of MATT Construction passes away at 85

Paul Matt, Chairman of MATT Construction, the builder behind many of Southern California’s most iconic architectural works like the Louis Kahn–designed Salk Institute, the Philip Johnson–designed Crystal Cathedral, and the Diller Scofidio + Renfro–designed Broad Museum, passed away earlier this month at age 85. In a memorial posted to MATT Construction’s website, Steve Matt, MATT CEO, said:
My father loved his work and the people he collaborated with. During his recent battle with non-Hodgkin’s lymphoma, he continued to apply his amazing passion for building. All of us at MATT take great solace that he lived to see his dream fully realized … building a company of great builders and great people. We will proudly carry on his legacy.
The senior Matt was born in Rome, New York in 1932 and earned a degree in structural engineering from Oregon Institute of Technology as a beneficiary of the G.I. Bill. Matt originally got his start in construction working as a welder on the Dalles Dam in Oregon outside of Portland. He later worked as a surveyor for the George A. Fuller Company, eventually landing the superintendent position for Kahn’s Salk Institute in 1962. During the course of the project, after the client scrapped the project in lieu of a complete re-design, Matt developed thoughtful approaches for constructing the complex’s iconic concrete formwork walls. The collaborative interchange between Matt, Kahn, and the client would go on to imbue Matt’s construction philosophy with the type of flexibility, ingenuity, and know-how necessary to cater to the needs of the era’s visionary architects. MATT Construction will hold a public celebration in honor of Paul later this month. See the MATT Construction website for more details.
Placeholder Alt Text

Displaced by subway construction, Los Angeles’ A+D Museum finds a new Arts District home

Los Angeles' often-mobile A+D Architecture and Design Museum, which has been displaced from its perch on Museum Row by Metro's Purple Line Extension, has found a new home in city's Arts District. Its new building, at 900 East 4th Street, is across the street from SCI-Arc. It features 8,000 square feet of space, brick walls, and a bow truss ceiling. The museum's two year lease began this month, and they hope to complete buildout by May. The effort will be led by Gensler, RTKL, and Matt Construction, but others will soon get involved, explained Executive Director Tibbie Dunbar, who appears thrilled to be out of limbo, despite regrets to be leaving the city's museum center. "It feels terrific," said Dunbar. "I'm excited to be near SCI-Arc, and I'm excited about what's going on in the Arts District. We'll be a big part of attracting people to the area." The A+D will be the burgeoning neighborhood's first museum. They also plan to sublease space to a design-focused tenant, such as a retailer or cafe. The museum, which depended on pro bono spaces early in its life, has a history of traveling. After starting in the Bradbury Building, its trajectory has involved a lot of numbers: 8560 Sunset Blvd, 5900 Wilshire Blvd, and 6032 Wilshire Blvd. After the museum's lease expires, it hopes to join forces with the AIA's Center for Architecture and Urban Design (CALA), which is still undergoing a search for its home.
Placeholder Alt Text

Broad Collection Sues Seele over Problematic Los Angeles Museum Facade

In a recent interview, Diller Scofidio + Renfro Senior Associate Kevin Rice told AN that the "veil" at Los Angeles' Broad Museum—a facade made of hundreds of molded Glass Fiber Reinforced Concrete (GFRC) panels, had been delayed by over a year. "Some of the things took longer to make than they thought, but there aren’t really problems with it," Rice said. But now it looks like the issues with the museum's facade are more severe than initially thought. The LA Times has reported that the Broad Collection and contractor Matt Construction are suing Seele, the engineer of that facade, seeking $19.8 million in damages relating to the delay. Other damages, according to the complaint (PDF), include breach of contract, fraud in the inducement, and fraud and deceit. The lawsuit, filed in Los Angeles Superior Court, alleges that Seele "violated the important 'aesthetic aspect' of the architect's design," and its mockups were "unsightly and wholly unacceptable for use on the project." As a result the firm was not able to meet its October, 2013 deadline to design, fabricate, and install the facade, setting the project's timeline way back. The Broad's lawsuit also names Zurich American Insurance Company and Fidelity and Deposit Company—backers of a bond guaranteeing Seele's work—as defendants. "Seele did not possess the necessary skill, experience, resources, commitment or ability to perform the work at The Broad museum," the complaint stated. Broad Foundation spokesperson Karen Denne told AN, "we're not commenting—the lawsuit speaks for itself." As of now the museum is still set to open in 2015, but the exact date remains up in the air.