Posts tagged with "Lower Manhattan":

Placeholder Alt Text

New York Expands Pop-Up Cafe Program in 2011

Could 2011 be the year of the pedestrian in New York? Under the guidance of DOT Commissioner Janette Sadik-Khan, NYC sidewalks will continue their slow march into the street next year as the city launches a major expansion of its "pop-up café" pilot program across its five boroughs. The first pop-up café tested out in Lower Manhattan this year proved successful enough that Sadik-Khan has expanded the program, planning for up to 12 sidewalk extensions. The concept is simple: street space is limited and valuable. To that end, New York has been evaluating whether the highest and best use for street space along narrow sidewalks is storing cars. Like a glorified Park(ing) Day spot made (semi-)permanent and held on high, these pop-up cafés invite pedestrians to imagine their city in new ways. In fact, the concept draws its inspiration from such pedestrian interventions. San Francisco began a Pavement to Park initiative incorporating their own version of the pop-up café, called a "parklet," several years ago, drawing upon the success of the Park(ing) Day event and pedestrian plazas in New York. California-based RG Architecture designed New York's pop-up café based on their parklet designs in San Francisco. New York's first pop-up café, recently put in storage for the winter, consisted of a six-foot wide wooden platform spanning about five parking spaces. The space accommodated 14 brightly colored café tables and 50 chairs. Sadik-Kahn says the concept is not only an innovative approach to urban design, it's also good for business. Each pop-up café is sponsored and maintained by adjoining shops and the benefits are tangible with up to 14% increases in business when the cafés were installed. "The Pop-up Café has been like night and day for our business, transforming a loading zone full of trucks into an attractive space that makes our storefront much more visible and accessible to potential customers," said Lars Akerlund, owner of Fika Espresso Bar, in a release. "This green oasis has really opened up the street, drawing more foot traffic and making the whole area more appealing." While each pop-up café is paid for by private businesses, the space is treated as public. Simply relaxing and enjoying the city is free and encouraged. The city is accepting applications for next year's pop-up cafés through Friday, December 3.

Santiago Calatrava’s Lower Manhattan PATH Station begins to takes flight

It'll be at least 4 years before Santiago Calatrava's scaled-back, over-budget World Trade Center PATH station is completed (though as our upcoming feature on Lower Manhattan showcases, everything's been a long time coming, but it seems to have finally arrived). Still, from the start of the interminable process, we've had some of the flashiest renderings around to tuck us in at night. Now comes an illustrated video courtesy the Journal's Metropolis blog that gives us our clearest view yet of just what's planned, as well as what Calatrava meant when he told the New Yorker a while back that he was striving for something akin to Grand Central—a truly great room where the interiors, not the exteriors, would be what truly matters. If this video is any indication, despite all the cutbacks, he's succeeded grandly.
Placeholder Alt Text

Statues Settle In at NYC City Hall

Since Wednesday, an aluminum woman is joyfully resting in the grass of City Hall Park. Among her well-set figurative friends are a bronze giant, an octopus man, and a couple of luminous neon creatures. The new sculptures are part of The Public Art Fund's yearly exhibit in the park, an ongoing project for more than 30 years with the aim of making visitors experience art more directly. This year’s show, named Statuesque, brings together a group of six artists from four different nations­. The ten works experiment with the sculptural tradition of the human figure, and are installed along the park's pathways and on lawns. “City Hall Park is really a great backdrop for this art,” Mayor Michael Bloomberg said at the opening. “The placement invites people to get up close and personal with these more contemporary figures and sculptures.” The featured artists are Huma Bhabha, Aaron Curry, Thomas Houseago, Matthew Monahan, Rebecca Warren, and Pawel Althamer. Never displayed together before, the pieces all tend towards abstraction over realism, and texture over refinement of finish––some exuberant, many robot-like and other almost gruesome. “It is unfiltered, it is memorable and it is immediate,” chief curator and director of The Public Art Fund Nicholas Baume concluded. New for this year is a free cellphone audio tour via an iPhone app.
Placeholder Alt Text

Cortlandt Coronation

Many New Yorkers were headed for planes, trains, and automobiles last Wednesday as they decamped for the Thanksgiving holiday, but not new MTA chief Jay Walder and a clutch of Lower Manhattan pols. They took the subway to Cortlandt Street, where a re-dedication of the of the the northbound R/W station took place, its restoration—which we first noticed in April—recently completed. “The MTA has played a key role in the revival of Downtown, and we’re excited to provide customers with an improved station just in time for the holidays," Walder said in a release. The station first reopened in September 2002 following the 9/11 attacks only to close in 2005 to accommodate work at Ground Zero. It has undergone a few minor changes since then, including wider stairwells—the better to facilitate the hoards of tourists descending on Century 21—and an expanded platform. The walls look much the same as they always have, though, having retained the trademark tile work of the Broadway line, according to MTA spokesman Kevin Ortiz. And while work on the southbound station is only beginning, its reopening was also announced: September 11, 2011, just in time for the tenth anniversary and the opening of the memorial.

Gerson’s Ground Zero Gambit

Alan Gerson, the City Council rep for Lower Manhattan, issued a major statement today along with the Lower Manhattan Redevelopment Committee, which he chairs. The statement lays out 17 demands the committee feels will ensure the timely opening of the memorial plaza by Septmber 11, 2011. It opens with an imposing if realistic appraisal of the challenges dogging the project so far:
The World Trade Center site is one of the most technically complicated modern construction projects ever undertaken: the building of five high rise towers, concomitantly, on a sixteen acre site over two train lines; issues of unprecedented toxicities and missing human remains; all in the middle of a bustling residential and business district. The architects, engineers and workers on the ground deserve credit for the performance of a difficult task, and interruptions, unexpected technical problems and delays should have been anticipated from its inception.
Gerson said that with the economy faltering, some might want to scale back or delay the project further, but he sees it as a WPA-style infrastructure opportunity, which can create jobs and infrastructure, which will be crucial once the economy rebounds. Gerson finished by asking Mayor Bloomberg, the Port Authority, and the LMDC to come together to finish the project on-time and in-line with Gerson's recommendations. An LMDC spokesperson said that the agency welcomed the advice but had the various projects under control. "It doesn't really look like anything new," the spokesperson said. And, according to today's Times, the disparate parties overseeing Ground Zero have come up with a new plan to finish the memorial and much of the site by the tenth anniversary. Update: Bloomberg spokesperson Jason Post responds: "We have different views. Council member Gerson thinks we need to add another layer of bureaucracy, the administration thinks we need to remove one." A list of Gerson's recommendations and a link to the full statement after the jump.
1. Appoint an auditor general to monitor all Lower Manhattan redevelopment projects 2. Reaffirm the 9/11/11 deadline for permanently opening the Memorial Plaza 3. Modify PATH train mezzanine to achieve simple elegance with columns 4. Within 90 days, the MTA must re-issue bid specifications for the Fulton Street Transit Hub with specification changes aimed at lowering costs by at least $200 million 5. Fully fund Fiterman Hall’s reconstruction 6. Reaffirm the Performing Arts Center (PAC) at the proposed location, with the 1,000-seat theater in a Gehry designed building, with the Joyce Theater as the anchor tenant 7. The Port Authority must issue a timeline for the turnover of Tower 2 to Silverstein Properties immediately and issue a status report and timetable, with benchmarks for the completion of any outstanding infrastructure work on the sites for Towers 2, 3 and 4 8. Immediately convene a Memorial access planning group 9. The LMDC must release design specifications 10. NYPD and FDNY must conduct and release a full security and fire safety audit of plans for the underground museum 11. Produce a Lower Manhattan bus plan within nine months 12. The LMDC must immediately issue a detailed status report and timetable on 130 Liberty Street and provide regular updates 13. Close Vesey Street between Church Street and West Broadway, but only if the Port Authority meets the burden of demonstrating that to do so would materially save time or provide for greater safety 14. Continue the Steering Committee recently established by Port Authority Executive Director Ward 15. Continue the Port Authority briefings for Family Members and Community Leaders in Lower Manhattan 16. Integrate the Tribute Center permanently into the Museum Entrance Building 17. Create a mechanism to strengthen construction site safety and Lower Manhattan’s livability
Read the eight-page statement, with details on all 17 points, here.
Placeholder Alt Text

The Real McCoy

During an unrelated call earlier today, Craig Dykers, head of Snohetta's New York office and the man behind the 9/11 memorial pavilion, divulged that he was rather disappointed with the renderings that the city released last week to widespread fanfare. It's bad enough that the design has been scaled back--like everything else on the site--but Dykers said that officials also went behind the firm's back to have the renderings done. He was then kind enough to send along some model shots he greatly prefers. Check 'em out after the jump.