Posts tagged with "building envelope":

Placeholder Alt Text

Accelerated build speed beats winter’s wrath in Chicago: Case Study

  The design-construction team for 1611 West Division had to get the project completed quickly while sticking to the goal of achieving LEED Silver certification. There were many ways to achieve those goals. However, the architect wanted the envelope to create a sense of movement that would identify with the character and individuality of the people living in this progressive community. But the designers wanted this building to be a significant structure in a Chicago area filled with distinctive architecture. They had to find exterior cladding that could go up quickly, provide high R-values, and give 1611 West Division an appearance that would become a landmark. The Solution: BENCHMARK by Kingspan Designwall™ 1000 insulated metal panels were specified to create the building’s envelope. The panels were arranged vertically across horizontal floor slabs and folded around the building almost like textile. By installing them in a staggered pattern, each unit has an individualistic quality and yet the entire structure is woven together seamlessly. The Designwall panel created a wall system that offers impressive curb appeal while providing excellent thermal performance. Today 1611 West Division offers much that is needed from a mixed-used, high-density urban building.
Placeholder Alt Text

Unveiled> Beloit College powerplant redevelopment by Studio Gang Architects

Beloit College in south central Wisconsin powered down its natural gas-fired Blackhawk Generating Station in 2005, but the building isn't out of steam yet. Chicago's Studio Gang Architects will help find new life for the former Alliant Energy property, connecting it by bridge to nearby residential and academic buildings. “We’re excited to work with Beloit College to transform an outmoded source of electricity into a wellspring of human energy,” Jeanne Gang said in a press release. “Our hope is that by reclaiming the Beloit waterfront for people, our project will inspire other communities around the globe to see human well-being as vitally interconnected with a healthy and clean environment.” Renovation of the riverside powerhouse is expected to be complete in 2018. Studio Gang said programs will include a coffee shop, lounges and student club rooms, a conference center, and a lecture hall / theater. The building will also house an 8-lane competition pool with space for 250 spectators, a 10,000-square foot fitness center, a 17,000-square foot gym, and a 3-lane track weaving through preserved coal bunkers and steel tubing. Gang will also salvage the building's brick walls and tile wainscoting, improving energy efficiency by harnessing the Rock River. An “isothermal envelope” will transfer energy from the adjacent river through a network of tubes under the exterior skin, “transforming the building walls into a radiant surface that will maintain a constant temperature within the Powerhouse throughout the year.” The 130,000-square foot project is part of an ongoing redevelopment of Beloit's riverfront, tying in with the Beloit 2020 plan to remake the formerly industrial Rock River as a community attraction. Bike paths, a river walk and riverside housing “will draw people back into the heart of Beloit,” according to a statement from Beloit College.