Posts tagged with "9/11 Memorial Plaza":

Placeholder Alt Text

Port Authority Threatens to Sue 9/11 Museum for $300 Million

In the days immediately following the show of solidarity on the tenth anniversary of 9/11, the Port Authority and Governor Cuomo retreated to one corner and Mayor Bloomberg and the Sept 11 Memorial and Museum Foundation to another over accusations of $300 million in cost overruns that neither party has agreed to pay. Construction of the museum has ground to a halt decreasing the likelihood that the Museum will open next year as promised. On December 15, the Governor told Albany radio host Fred Dicker that the Port Authority was “on the verge” of suing the Foundation. The PA charged that the Foundation has not provided $156 million for infrastructure costs and has subsequently not reimbursed the Authority for awarded contracts since immediately after the anniversary. On the radio show, Cuomo said $300 million was owed to the PA, an amount said to include newly revised project costs as well as money already spent on infrastructure. In a statement, Michael Frazier, the foundation’s spokesperson, said, “The 9/ll Memorial has met every funding commitment. There is no validity to the Port Authority’s claim; in fact, as recently as yesterday this claim was half of this amount. The Memorial has a counterclaim against the Port totaling more than $140 million. The Mayor clarified all of this today.” In a rebuttal made at a news conference on Friday at a Bronx elementary school, Mayor Bloomberg said, “We don’t owe anything.” While noting that the city is working with PA to resolve the issue, he added, “It’s hard to see us getting to a courtroom, but if it has to go there, it has to go there.” A source familiar with the situation said that there is a $300-500 million bill lurking and unaccounted for, but that it has to do with site-wide security costs. At issue as well is the dedicated task force assembled by former PA head Chris Ward to cut through previous disagreements, which may have been disbanded when the new director Patrick Foye took over. Whether the city or the Port Authority is responsible for escalating security costs seems unclear. With a virtual halt in construction, Frazier said in a phone call that the timely completion of the Museum is endangered. “The Museum was next in line to be completed before Towers Four and even One. What’s really at stake now are all the items and donations by family members and others that were entrusted to us to preserve but are now in storage and in jeopardy.”
Placeholder Alt Text

9/11 Memorial Plaza: How It Works

A decade after the 9/11 attacks, the public will soon be able to visit the site, much of which has been fully transformed into the 9/11 Memorial Plaza. While many were dispirited by the years of revisions to and deviations from the Libeskind master plan (which itself had many detractors), AN's recent visit to the plaza, crowded with workers laboring toward the anniversary opening, revealed a vast, contemplative space that we predict will function well as both a memorial and a public space. Next week AN will take a look at the design and offer a preview of the what the public can expect from the space, but, first, a look at how the highly engineered plaza works. With transit tunnels, mechanical systems, and much of the memorial museum located below the surface, the plaza itself could only be approximately six feet thick. Unlike the original World Trade Center Plaza, which many found to be barren and scorching or windswept, the Memorial Plaza is conceived of as an abstracted forest of Swamp White Oaks surrounding two monumental pools outlining the footprints of the original towers. Designed by Michael Arad and Peter Walker Partners, with Aedas, the plaza will include approximately 400 trees, 215 of which will be in place for the opening. About one third of the plaza has yet to be constructed, while the Santiago Calatrava designed PATH station is being completed. Plaza plantings are arranged in bands, alternating between bands of pavers and bands of trees, grass, and ground cover. This creates both a unifying visual language for the large plaza and a highly rational system for organizing the mechanical and irrigation systems on the site. Between the planting bands, accessible utility corridors house electrical and security equipment. Drainage troughs divide the planting bands from the utility corridors. The whole plaza acts as a vast stormwater collection tray. The plaza is very carefully graded to channel stormwater into the drainage troughs. Rainwater is collected in cisterns below and recirculated in the plaza's drip irrigation system as well as funnelled into the memorial fountain. The trees grow in a lightweight mixture of sand, shale, and worm casings. Growing and installing the plaza's oaks has been a long process. Given the pace of slow construction, the trees, which have been cultivated at a nursery in New Jersey, are much larger now, most standing around 25 feet tall. Trees were hauled onto the site with cranes and then placed in the planting beds with a specially designed lift. Tree roots will spread laterally, filling in the planting bands, and designers believe they will eventually reach 60 to 80 feet in height. The roots are anchored with bracing under the stone pavers. While the PATH station is being completed, the remaining unfinished plaza is still an uncovered construction site, inaccessible to the public. According to Matthew Donham, a partner at Peter Walker, the construction of that portion of the plaza will be even thinner in depth. Aside from an expansion joint, there will be no visible difference between the two sides.